Our Process

Three steps from 'Can I build an ADU?' to keys in hand. We handle the complexity so you don't have to.

Step 1

Free Feasibility Study

Submit your property address and we run it through our automated GIS pipeline. We cross-reference Whatcom County parcel data, zoning maps, critical area overlays, Lake Whatcom Watershed boundaries, and transit routes to determine exactly what you can build.

  • Parcel zoning and lot size verification
  • ADU eligibility assessment (yes/no/conditional)
  • Maximum ADU count and size allowed
  • Critical areas and watershed check
  • Parking requirements or exemptions
  • Preliminary cost estimate by ADU type
Start Your Free Feasibility Study

What You'll Receive

1
Custom feasibility report for your property
2
Zoning district and lot data from county GIS
3
ADU eligibility determination
4
Recommended next steps and cost range

DELIVERED WITHIN 48 HOURS

What's Included in Your Permit Package

  • Full zoning verification for your specific parcel
  • Setback and lot coverage analysis
  • Utility connection assessment (sewer, water, electrical)
  • Critical areas review with consultant referral if needed
  • Pre-application meeting with planning department
  • Written Permit Feasibility Report
  • Land use permit application and management
  • Building permit drawings and engineering
  • Building permit submission and follow-through
YOUR PERMIT INVESTMENT CONVERTS TO A BUILD DEPOSIT WHEN YOU SIGN THE LOI

Step 2

Full Permit Package

Our permit specialist, Loren, takes over. He conducts a deep-dive analysis of your property, meets with the planning department, and handles every aspect of your land use and building permit applications — from initial zoning analysis through final permit approval.

You'll receive a comprehensive Permit Feasibility Report telling you exactly what type(s) of ADU your property can support, maximum size and configuration, all restrictions, estimated timeline, and estimated total project cost.

If your property doesn't qualify, we'll tell you honestly. And when you sign the Letter of Intent to build with us, your entire permit package investment is applied as a deposit toward your construction contract.

Step 3

Letter of Intent + Build

With permits cleared and design approved, you sign a Letter of Intent and we begin the build. Your permit package investment is applied as a deposit toward your construction contract — so you're already invested in your build from day one. Carlos coordinates your architectural drawings, structural engineering, and construction from foundation to final inspection. See our detailed cost breakdown for transparent pricing at every phase.

  • Full architectural design by our licensed architect
  • Site plan preparation and submission
  • Master permit application and management
  • All structural and civil engineering
  • Construction from foundation to finish
  • Final inspection coordination
  • Warranty on all work

Your Team

C

Carlos

Builder & General Contractor. One point of contact from design through final inspection.

L

Loren

Permit Specialist. Navigates every submission and follows up with county staff.

A

Architect

Licensed residential architect. Designs optimized for your lot constraints and zoning.

Check Your Property's ADU Potential

Get a free feasibility report based on Whatcom County GIS data and 2026 land use rules.

Get Your Free Feasibility Study

Or call us directly: (360) 594-0120

Call Free Feasibility Study